|
Build Your Online Product Catalogs?
Product Name: |
Soft concrete bridge head filling
|
Supply Ability: |
|
Related proudcts |
light concrete, |
Specifications |
123 |
Price Term: |
CIF |
Port of loading: |
|
Minimum Order |
|
Unit Price: |
|
|
The advantages of the application of foam light soil for road expansion and expansion project are mainly reflected in the following aspects: 1. The expansion of subgrade can be vertically filled to save land resources and avoid or reduce the demolition of buildings. 2. The expansion of the embankment of soft foundation can greatly reduce the load, which can save the soft foundation of the expansion roadbed or reduce the soft base processing strength; It also effectively reduces the difference settlement of new old roadbed and the additional settlement of nearby buildings. 3. With the construction of the piping pump, the construction takes up little ***ce, which does not affect the existing traffic, and maintains the existing road facilities (anti-collision bars, gutters, etc.). 4. The widening of the steep section of the mountain can avoid the stability problem caused by high filling and excavation, and can maintain the natural mountain form and protect the natural environment. 5. Convenient construction and short construction period. Second, the bubble of lightweight soil used for soft foundation abutment back filling the abutment soft ground road station back in filled bubble light earth used in soft ground section of the abutment back in filling machine, the use of lightweight, independence after curing, can be to make the following optimization routine method: 1. Optimize the double-row pile bridge platform for single row piles; 2. Significantly reduce the soft base processing strength. After optimization, reducing settlement and uneven settlement, eliminate back the post-construction settlement of embankment filling itself, to avoid car bump and greatly reduce maintenance costs work background back and so on technical and economic advantages. 3. The foam light soil is used for the old road bridge jumping car to control the conventional road and pavement construction method to add new pavement to the original road surface to reduce the slope difference caused by subsidence. Due to the increased load |
Company: |
Yantai Chilung Energy-saving & Construction Technology Co., Ltd
|
Contact: |
Ms. Mingqing Feng |
Address: |
NO.152-3.Puwan,Fushan,Yantai,Shandong |
Postcode: |
265500 |
Tel: |
86-0535-6338839 |
Fax: |
86-0535-6338839 |
E-mail: |
|
|
|
|